CMS Document 13096-v35

HB/HE ngCCM Production 2016/2017/2018

Document #:
CMS-doc-13096-v35
Document type:
Technical Data
Submitted by:
Stephen Goadhouse
Updated by:
Stephen Goadhouse
Document Created:
14 Jun 2016, 22:03
Contents Revised:
04 Feb 2019, 00:27
Metadata Revised:
04 Feb 2019, 00:27
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
CMS-doc-13096-v34
13 Jan 2019, 13:45
CMS-doc-13096-v33
04 Jan 2019, 16:33
CMS-doc-13096-v32
05 Dec 2018, 22:09
CMS-doc-13096-v31
05 Dec 2018, 21:38
CMS-doc-13096-v30
05 Dec 2018, 21:17
CMS-doc-13096-v29
08 Oct 2018, 12:07
CMS-doc-13096-v28
21 Aug 2018, 09:32
CMS-doc-13096-v27
20 Aug 2018, 17:15
CMS-doc-13096-v26
27 Jul 2018, 12:26
CMS-doc-13096-v25
21 Jun 2018, 19:00
CMS-doc-13096-v24
21 Jun 2018, 18:59
CMS-doc-13096-v23
21 Jun 2018, 18:20
CMS-doc-13096-v22
08 May 2018, 15:44
CMS-doc-13096-v21
23 Apr 2018, 21:40
CMS-doc-13096-v20
13 Apr 2018, 22:49
CMS-doc-13096-v19
04 Apr 2018, 01:38
CMS-doc-13096-v18
28 Mar 2018, 18:51
CMS-doc-13096-v17
27 Mar 2018, 17:19
CMS-doc-13096-v16
27 Mar 2018, 05:11
CMS-doc-13096-v15
15 Mar 2018, 21:49
CMS-doc-13096-v14
15 Mar 2018, 21:44
CMS-doc-13096-v13
27 Feb 2018, 20:47
CMS-doc-13096-v12
13 Jan 2018, 03:38
CMS-doc-13096-v11
29 Sep 2017, 18:18
CMS-doc-13096-v10
01 Sep 2017, 13:55
CMS-doc-13096-v9
28 Feb 2017, 20:04
CMS-doc-13096-v8
27 Feb 2017, 14:48
CMS-doc-13096-v7
24 Feb 2017, 16:50
Abstract:
PRODUCTION 2 HE cards (2017) are the cards for HE installation and they are RED for both Clock and Control boards.

PRODUCTION 2 HB cards (2018) are the cards for HB installation and they are RED for the Control boards and YELLOW for the Clock boards. They are the same design as the HE Clock and Control boards. The HB Control boards are built exactly like the HE Control boards. The HB Clock boards are built with a slightly different BOM. See the ngCCM HB Module Combined Production Bill of Material for the HB BOM. The HB Clock boards should be compatible as spare replacements for HE Clock boards

The production 1 card (2016) are BLUE and should not be used for installation in the the CMS detector.

The HE Phase 1 ngCCM includes two clock boards and two control board. The control board includes a 4.8Gbps serdes (Igloo2 FPGA based) and an optical transceiver (Cern VTRx with both SM and MM supported).

The HB Phase 1 ngCCM is similar to the HE module but includes only one clock board for a total of three boards. HE and HB have same firmware, but the DIP Switch #4 must be moved down on HB ngCCMs.

Working and testing page: https://twiki.cern.ch/twiki/bin/view/CMS/HCAL/NgCCMHEHBProd

Files in Document:
Other Files:
Notes and Changes:
Adding updated GBT bit spreadsheets
Related Documents:
Referenced by: