CMS Document 12362-v14
HF ngCCM igloo2 mezzanine
- Document #:
- CMS-doc-12362-v14
- Document type:
- Technical Data
- Submitted by:
- Tullio Grassi
- Updated by:
- Tullio Grassi
- Document Created:
- 18 Jul 2014, 10:45
- Contents Revised:
- 03 Sep 2014, 17:05
- Metadata Revised:
- 03 Sep 2014, 17:07
Viewable by:
- Public document
Modifiable by:
Quick Links:
Latest Version
CMS-doc-12362-v26
12 May 2015, 17:54 |
CMS-doc-12362-v25
12 May 2015, 10:13 |
CMS-doc-12362-v24
03 Feb 2015, 15:52 |
CMS-doc-12362-v23
03 Feb 2015, 11:43 |
CMS-doc-12362-v22
22 Jan 2015, 11:15 |
CMS-doc-12362-v21
18 Dec 2014, 16:24 |
CMS-doc-12362-v20
18 Nov 2014, 10:25 |
CMS-doc-12362-v19
27 Sep 2014, 18:43 |
CMS-doc-12362-v18
24 Sep 2014, 14:13 |
CMS-doc-12362-v17
23 Sep 2014, 17:35 |
CMS-doc-12362-v16
12 Sep 2014, 11:32 |
CMS-doc-12362-v15
04 Sep 2014, 11:31 |
CMS-doc-12362-v13
29 Aug 2014, 15:53 |
CMS-doc-12362-v12
29 Aug 2014, 15:43 |
- Abstract:
- Rad-tol mezzanine for HF ngCCM.
- Files in Document:
-
- Modifications_of_ngCCM_Mezz_3Sep2014.pptx (96.7 kB)
- igloo2_mezz_specs.doc (167.5 kB)
- Altium project for the board design (igloo2_UMd_Mezz_3Sep_17h01.zip, 3.9 MB)
- Other Files:
- Stability_of_igloo2_recovered_clock.pdf (58.1 kB)
- Layout Guidelines for IGLOO2, from Microsemi (LayoutGuidelines_for_m2s_m2gl_AC394_an_v1.pdf, 6.6 MB)
- Libero project (firmware) for the igloo2 FPGA (Libero_igloo2_UMD_mezz_19Aug_14h54.zip, 31.8 MB)
- initial comparison of TMR and non TMR (igloo2_fw_studies.zip, 92.6 MB)
- Topics:
- Authors:
- Notes and Changes:
- 1) Added the file Modifications_of_ngCCM_Mezz_3Sep2014.pptx with specs to modify the PCB.
2) Update the Altium project to igloo2_UMd_Mezz_3Sep_17h01.zip with two mods on the schematics (VPP changed to 3V3 and J3 connector modified as on point 1 above. No changes on the PCB (which are left to be done on the layout job).
- Related Documents:
- CMS-doc-11876: HF ngCCM prototype 2013
- CMS-doc-12382: Automatic TMR in Microsemi FPGAs
- Referenced by:
- CMS-doc-12428: GLIB v2 Firmware and Other Files for prototype HF ngCCM design efforts
- CMS-doc-12520: HF ngCCM pre-production 2014
- CMS-doc-12596: igloo2 UMd mezzanine production 2015
- CMS-doc-12666: HE/HB ngCCM pre-production prototype (PPP) 2015
- CMS-doc-12632: HF ngCCM base-board production 2015