Document List by Topic

These documents on CMS Upgrade Projects and sub-topics are available:
Showing documents with topic CMS Upgrade Projects on the most recent version. See documents with Upgrades on any version.

CMS-doc-# Title Author(s) Topic(s) Last Updated
4802-v4 Versatile TransReceiver (VTRx) and Twin-Transmitter (VTTx) modules. Tullio Grassi Common Electronics
HCAL Upgrades
Research and Development
HCAL Phase I Upgrades
24 Jan 2017
12233-v1 LHC4913 positive voltage regulator Various Authors Upgrades
01 Dec 2016
3044-v26 CMS Bulletin Paraskevas Sphicas Upgrades
Official Documents
BRIL
Muon
Physics
Offline
Information Systems
ECAL
Technical and Run Coordination
HCAL
Communications Infrastructure
CMS Management
Outreach and Education
Computing
Tracker
Communications Group
Trigger and DAQ
18 Jun 2016
12941-v1 Charge for CMS Phase II Upgrades Comprehensive Reviews Austin Ball et al. Upgrades
Management and Planning
Upgrades - Phase 2
07 Apr 2016
12725-v1 CMS Membership Andrzej Charkiewicz et al. Upgrades
Countries
CMS Management
Admin tags (DocDB)
12 Oct 2015
6473-v1 SketchUp Drawings of the Phase 1 pixel detector alongside the current pixel detector Tai Sakuma Upgrades
Computing, Software, and Physics
03 Aug 2014
5691-v3 Studies of 8b10b for GBTX ASIC Stephen Goadhouse et al. Research and Development
17 Jun 2014
3857-v3 GBTX specifications Various Authors Upgrades
HCAL Phase I Upgrades
11 May 2014
5946-v8 GBTX LTB Tullio Grassi General Technical Information
18 Apr 2014
12141-v1 ECFA High Luminosity LHC Experiments Workshop report Didier Contardo Upgrades
21 Nov 2013
11806-v2 Images for US LHC CMS Detector Upgrade Project Thomas McCauley Upgrades
CD-1 Meetings
CD-1 Review
US Upgrades - Phase 1
Reviews
USA
13 Aug 2013
11984-v1 CMS GE1/1 organigram Archana Sharma Upgrades
Muon
CMS Management
30 Jul 2013
11657-v4 CMS TECHNICAL DESIGN REPORT FOR THE LEVEL-1 TRIGGER UPGRADE Darin Acosta et al. Upgrades Technical Proposal
L1 Trigger Upgrades
L1 Trigger
06 May 2013
11557-v1 US-CMS Upgrades Project -- Powerpoint Slides Template Lucas Taylor Upgrades
CD-1 Review
US Upgrades - Phase 1
Reviews
USA
27 Nov 2012
11544-v1 US DOE Guidelines for CD1 Project Review USA DOE CD-1 Review
US Upgrades - Phase 1
Countries
Reviews
Review Documents
USA
21 Nov 2012
5195-v1 U.S. CMS Operations Program Management Plan Joel Butler et al. Computing, Software, and Physics
USA
06 Nov 2012
6471-v6 Overview of the CMS Technical Design Report for the Pixel and HCAL Detector Upgrades Draft Didier Contardo et al. Upgrades
LHCC Reports / Reviews
TDR
31 Aug 2012
3786-v2 CMS Upgrade Project Organigram Didier Contardo et al. Upgrades
Organigram
02 Mar 2012
2717-v15 Phase 1 Upgrade Technical Proposal Joel Butler Upgrades
Upgrades Technical Proposal
03 Jun 2011
4801-v1 Specifications for Small Form Factor Pluggable Module SFP+ Various Authors Upgrades
HCAL Upgrades
16 May 2011

Number of documents found: 20

Execution time: 2 wallclock secs ( 0.69 usr + 0.07 sys = 0.76 CPU)