Document List by Group

These documents for CMS are available:

CMS-doc-# Title Author(s) Topic(s) Last Updated
13096-v35 HB/HE ngCCM Production 2016/2017/2018 Alberto Belloni et al. HCAL Phase I Upgrades
13 Sep 2019
3860-v7 Run Coordination Organigram Lucia Silvestris Run Coordination
Organigram
11 Sep 2019
3046-v143 CMS Calendar -- current calendar plus previous versions Dawn Alison Hudson Technical and Run Coordination
CMS Management
TC Planning
Official Documents
27 Aug 2019
5751-v5 Physics performance and datasets Organigram Giovanni Franzoni Organization
28 Jun 2019
13847-v2 CMS Code of Conduct Joanne Cole et al. Collaboration Board
14 Jun 2019
13099-v8 Top-level muon organigram Jay Hauser Muon Management
Muon
12 Jun 2019
11876-v50 HF ngCCM prototype 2013 Stephen Goadhouse et al. HCAL Phase I Upgrades
HCAL Upgrades
03 Apr 2019
13424-v5 Derived datasets from the H to 4l example analysis using CMS public data Thomas McCauley Communications Group
Higgs
02 Apr 2019
12691-v2 Muon Constitution Various Authors Muon Management
Official Documents
Muon
05 Feb 2019
12889-v3 igloo2 remote programming Various Authors HCAL Phase I Upgrades
13 Nov 2018
12192-v3 HF upgrade data fibers Tullio Grassi et al. HF 2012
HCAL Upgrades
17 Jun 2014
6209-v2 Poster to show French involvement in CMS David Barney Presentations for Outreach
Publications for Outreach
Images for Outreach
11 Jul 2018
5602-v3 Poster to show Austrian involvement in CMS David Barney Presentations for Outreach
Publications for Outreach
Images for Outreach
11 Jul 2018
2715-v6 CMS 3-D image for inclusion in presentations - black background David Barney et al. Outreach and Education
10 Jul 2018
5626-v3 CMS Photo Calendar 2012 Various Authors et al. Communications Group
09 Jul 2018
12070-v4 Cracking the Cosmic Code David Barney Presentations for Outreach
09 Jul 2018
12063-v6 Set of CMS Posters in English and French Various Authors Outreach and Education
09 Jul 2018
4172-v2 Interactive Slice of the CMS detector Various Authors et al. Presentations for Outreach
Movies for Outreach
09 Jul 2018
12935-v4 CMS Software/Computing organigram (2018) Elizabeth Sexton-Kennedy CMS Management
Offline
Computing
19 May 2018
12782-v2 CMS HE FE QIE card - Upgrade Production Version Theresa Shaw HCAL Phase I Upgrades
HCAL Electronics
HCAL
20 Apr 2018
11899-v9 CERN FEASTMP DC-DC converters Various Authors HCAL Phase I Upgrades
Research and Development
26 Jan 2018
12743-v2 Phase I upgrade HE Calibration Module, Pin Diode Rev3.0 Russell D. Taylor HCAL Phase I Upgrades
HCAL Electronics
HCAL
Technical Scope
HCAL Upgrades
US Upgrades - Phase 1
06 Dec 2016
12784-v2 HE Production Backplane for the Phase-1 Upgrade Theresa Shaw HCAL Phase I Upgrades
HCAL Electronics
HCAL
21 Dec 2017
12352-v23 HF 24-Channel Production and PreProduction Readout Module Theresa Shaw HCAL Phase I Upgrades
HCAL Electronics
06 Sep 2017
12142-v6 Preshower Low Voltage documentation David Barney et al. Low Voltage
29 Apr 2017
12666-v30 HE/HB ngCCM pre-production prototype (PPP) 2015 Stephen Goadhouse HCAL Phase I Upgrades
HCAL Upgrades
26 Feb 2017
12201-v5 LHC CMS Detector Upgrade Project --- Technical Design Report Various Authors CD-2/3 Review
Technical Scope
US Upgrades - Phase 1
15 Feb 2017
5589-v6 RPC organization chart Various Authors RPC Management
Muon Resistive Plate Chamber (RPC)
Muon
26 Jan 2017
5564-v4 HCAL RBX CAD design files Various Authors Archive
HB, HE, HO
15 Sep 2016
3044-v26 CMS Bulletin Paraskevas Sphicas Physics
Offline
ECAL
Technical and Run Coordination
Information Systems
Communications Group
CMS Management
Upgrades
Tracker
Trigger and DAQ
HCAL
Official Documents
Muon
BRIL
Outreach and Education
Communications Infrastructure
Computing
18 Jun 2016
12802-v2 HGCAL PCB files for 128-cell sensors for FNAL tests 2016 Merritt Miller HGC Detector modules
20 Jan 2016
11974-v24 HF 24-Channel Prototype Readout Module Erich John Frahm et al. HCAL Upgrades
06 Nov 2015
11541-v2 uHTR (Pre-production) Erich Frahm et al. HCAL Phase I Upgrades
HCAL Electronics
09 Sep 2015
12520-v6 HF ngCCM pre-production 2014 Stephen Goadhouse HCAL Phase I Upgrades
HCAL Upgrades
13 Aug 2015
2631-v2 QPLL and related crystal Paulo Rodrigues Simoes Moreira Common Electronics
HCAL Electronics
Manuals
Front End
23 Jul 2015
12362-v26 igloo2 UMd mezzanine proto2014 for HF ngCCM Tullio Grassi et al. HCAL Phase I Upgrades
12 May 2015
11521-v6 QIE10_P5 Specification Thomas N Zimmerman HCAL Upgrades
13 Mar 2015
11700-v5 Specifications for the HF ngCCM Tullio Grassi HCAL Phase I Upgrades
20 Feb 2015
11976-v7 Higgs candidate events for use in education and outreach Thomas McCauley Communications Group
Outreach and Education
29 Sep 2014
12069-v5 Radiation Testing of Igloo2 Jeremiah Michael Mans HCAL Phase I Upgrades
HCAL Electronics
HCAL Upgrades
22 Sep 2014
12395-v2 Event display for the Fundamental Physics Brochure - Sept 2014 Various Authors et al. Communications Group
04 Aug 2014
5691-v3 Studies of 8b10b for GBTX ASIC Stephen Goadhouse et al. Research and Development
17 Jun 2014
12150-v2 Event displays for poster at P5 Thomas McCauley Communications Group
07 Jan 2014
12057-v2 CMS posters produced for CERN Open Days Various Authors Outreach and Education
21 Oct 2013
5930-v9 SEU handling in ECAL Pedro Guilherme Ferreira Parracho ECAL
P5 Operations
Data Acquisition
11 Oct 2013
12053-v3 Higgs to gamma gamma candidate event displays using SketchUp Thomas McCauley et al. Communications Group
Images for Outreach
06 Sep 2013
11916-v2 Dielectron events for use in education and outreach Thomas McCauley Communications Group
Outreach and Education
01 Jul 2013
11806-v2 Images for US LHC CMS Detector Upgrade Project Thomas McCauley Reviews
USA
US Upgrades - Phase 1
Upgrades
CD-1 Meetings
CD-1 Review
13 Aug 2013
11970-v8 Public statement: A very rare decay has been seen by CMS, EPS-HEP Conference, 19 July 2013 Achintya Rao Publications for Outreach
B Physics
30 Jul 2013
11879-v3 3D model of the inner CMS part Nebojsa Smiljkovic Beam Pipe
19 Jun 2013
11657-v4 CMS TECHNICAL DESIGN REPORT FOR THE LEVEL-1 TRIGGER UPGRADE Darin Acosta et al. Upgrades Technical Proposal
L1 Trigger Upgrades
L1 Trigger
06 May 2013
11557-v1 US-CMS Upgrades Project -- Powerpoint Slides Template Lucas Taylor Reviews
USA
US Upgrades - Phase 1
Upgrades
CD-1 Review
27 Nov 2012
3327-v15 HCAL Trigger Readout module (HTR) Revision 4 Design Documentation Andrew Baden et al. HCAL Electronics
HTR
11 Feb 2013
11615-v2 Event files for masterclass exercise 2013 Thomas McCauley Communications Group
Outreach and Education
04 Feb 2013
5669-v22 Pixel Phase 1 Upgrade TDR Aaron Dominguez et al. Pixels
TDR
TDR
09 Nov 2012
9441-v6 Researchers’ Night 2012 – 28 September 2012 Marzena Lapka Communications Group
Outreach and Education
26 Oct 2012
5529-v5 Google Earth Story: Computing Grid David Barney et al. Outreach and Education
Communications Infrastructure
Computing
20 Sep 2012
6471-v6 Overview of the CMS Technical Design Report for the Pixel and HCAL Detector Upgrades Draft Didier Contardo et al. TDR
Upgrades
LHCC Reports / Reviews
31 Aug 2012
5599-v3 Studies for the upgrade of the CMS HCAL Front-End electronics Tullio Grassi HCAL Phase I Upgrades
27 Mar 2012
5706-v11 Public Statement on Latest Higgs Results -- CERN Seminar, 13th December 2011 Various Authors Physics
Higgs
Publications for Outreach
Communications Group
CMS Management
Physics Analysis Groups
Outreach and Education
09 Mar 2012
2530-v2 CMS Centre @ CERN -- Console specifications and costs Lucas Taylor CMS Centres Worldwide
CMS Centre @ CERN
28 Nov 2011
2813-v3 CMS ECAL Conference Committee David Barney Conference Committee
27 Jun 2011
3017-v13 DCU Voltage & Temperature Readout Calibration Study Sergey Los et al. Pixel Operations
Forward
21 Jun 2011
2717-v15 Phase 1 Upgrade Technical Proposal Joel Butler Upgrades Technical Proposal
Upgrades
03 Jun 2011
2713-v2 CMS-ECAL Technical Design Report Various Authors et al. ECAL
TDR
General Design and Operation
Official Documents
12 May 2011
3957-v2 CMS Magnet Technical Design Report (TDR) Various Authors et al. TDR
12 May 2011
2852-v7 JIRA tutorial for CMS ECAL David Barney Technical Coordination
11 Mar 2011
2600-v11 CMS Physics Organigram Anastasia Dolya et al. Physics
CMS Management
Management Board
15 Feb 2011
2607-v1 Feature requests for DocDB Lucas Taylor Information Systems
14 Jun 2010
1071-v2 Poster for SciDAC 2006 Erik E Gottschalk et al. CMS detector
Accelerator
28 Apr 2010
1718-v3 DCS-Alarm Critical Vunerability Review Lucien Cremaldi Procedures
DCS
Controls
28 Apr 2010
532-v2 Site Visit of the National Ignition Facility Erik E Gottschalk Site Visits
CMS Centres Worldwide
28 Apr 2010
622-v2 ESA Site Visit Report Erik E Gottschalk Site Visits
CMS Centres Worldwide
28 Apr 2010
404-v5 PIXEL FAILURE MODES Lucien Cremaldi General
Monitoring
27 Apr 2010
2333-v5 CMS FPIX Upgrade Cooling Specifications Richard L. Schmitt Cooling System
05 Feb 2010
2436-v3 DCS and TSS action matrix and documentation Charles Newsom XDAQ
PVSS
Procedures
General
Controls
PLC
Monitoring
Safety
15 Jun 2009
2381-v4 CMS Pixel DCS meeting agenda Charles Newsom et al. DCS
03 Mar 2009
2013-v13 Pixel DSS/DCS Schedule and Milestones Danek Kotlinski et al. Controls
24 Feb 2009
1062-v28 Pixel FSM Tree Design Christian Veelken Controls
26 Nov 2008
2167-v14 Pixel PLC Code Review - Responses Christian Veelken Controls
Monitoring
22 Jun 2008
1735-v3 DCS Critical Review Response Lucien Cremaldi et al. Forward
Monitoring
Safety
17 Apr 2008
1136-v14 Siemens S7 Racks Christian Veelken Controls
Commissioning
02 Apr 2008
1861-v16 CMS Pixel DCS PVSS Project Christian Veelken Controls
Commissioning
Monitoring
29 Mar 2008
1670-v11 LHC@FNAL Status Report Bill Badgett et al. CMS detector
Workgroup: Outreach
Workgroup: FESS
Workgroup: LHC
Technical
Accelerator
Workgroup: CMS
03 Nov 2007
1805-v3 TIF and P5 DCS Status Charles Newsom Controls
07 Aug 2007
493-v2 FPix DCS subgroup report Lucien Cremaldi et al. Controls
Forward
12 Oct 2005
1142-v1 Minutes of FPixel DCS meeting 7/18/06 Charles Newsom et al. Controls
Minutes
Forward
18 Jul 2006
1258-v2 Cooling channel brazed blank status for 8Sept06 Tech Board Joe W. Howell Disks
31 May 2007
1709-v2 CMS Remote Operations Alan Stone CMS detector
Workgroup: Outreach
Workgroup: CMS
LHC @ FNAL
23 May 2007
1656-v3 EWG Status Report Erik E Gottschalk et al. Workgroup: FESS
22 Apr 2007
1216-v2 CMS Pixels in Test Beam Lorenzo Uplegger Sensors
ROC
Testbeam
Forward
17 Apr 2007
981-v6 Charge for LHC@FNAL Integration Task Force Erik E Gottschalk Organization
06 Dec 2006
2-v2 CMS Pixel Database: Design Umesh Joshi Databases
06 Nov 2006
1360-v4 Remote Operations for High Energy Physics - LHC@FNAL Patty McBride LHC @ FNAL
01 Nov 2006
1276-v3 SiDET Status for CMSWeek Sept.06 Alan Hahn Assembly
18 Sep 2006
1272-v3 LHC@FNAL Update presented at LARP Meeting Erik E Gottschalk Organization
Technical
13 Sep 2006
1057-v15 EPAC06 paper and poster on LHC@FNAL Kurt Biery et al. Scenarios
CMS detector
Organization
Technical
Accelerator
Requirements
21 Jun 2006
960-v4 LHC@FNAL Presentation to UEC Erik E Gottschalk CMS detector
Accelerator
06 May 2006
869-v4 CMS FPIX Testbeam Studies Luigi Moroni et al. Sensors
Testbeam
Reports
03 Apr 2006
165-v46 LHC@FNAL Requirements Document Erik E Gottschalk et al. Requirements
24 Mar 2006
381-v0 Agenda Alan Hahn Assembly
25 Aug 2005
792-v2 LHC@FNAL - Remote Operations for CMS & LHC Erik E Gottschalk CMS detector
05 Mar 2006
402-v3 Assembled sensor alignment concept overview Greg Derylo Alignment
Assembly
24 Jan 2006
639-v2 LHC@FNAL Requirements for Remote Operations Erik E Gottschalk Requirements
21 Dec 2005
441-v2 Site Visit Status Suzanne R Gysin Site Visits
03 Nov 2005
488-v4 Break Out talk - Plaquette and Panel Testing at SiDet Michael T Eads Panels
Plaquettes
13 Oct 2005
489-v2 Database Working Group Report Yuyi Guo et al. Databases
12 Oct 2005
425-v2 Mauna Kea Remote Operations Erik E Gottschalk Site Visits
04 Oct 2005
438-v3 Minutes of FPix DCS/PVSS meeting on 9/27/05 JC Yun Controls
Minutes
Forward
30 Sep 2005
408-v2 Site Visit Status Suzanne Panacek Site Visits
08 Sep 2005
405-v2 LHC@FNAL Remote Operations Erik E Gottschalk Organization
Accelerator
07 Sep 2005
401-v0 Gage 40 MHz ADC for Plaquette Test Setup Michael T Eads Assembly
06 Sep 2005
138-v8 Scenario for debugging the Schottky detector Jean Slaughter Scenarios
20 Jul 2005
292-v1 CMS Computing Scenario: Patty McBride Scenarios
20 Jul 2005
286-v2 CMS Tracker Scenario: Tracker check out during operations Patty McBride Scenarios
20 Jul 2005
280-v2 CMS Tracker Scenario: Unstable Beam Conditions Patty McBride Scenarios
20 Jul 2005
287-v1 CMS Tracker Scenario: Tracker commissioning and debugging shifts Patty McBride Scenarios
20 Jul 2005
289-v2 CMS HCAL Scenario: detector expert participation in the CMS commissioning shifts Patty McBride Scenarios
20 Jul 2005
130-v5 Scenario - Run a "normal" CMS data-monitoring shift at FNAL Erik E Gottschalk et al. Scenarios
20 Jul 2005
290-v2 CMS HCAL Scenario: LHC@FNAL expert on-call during normal operations Patty McBride Scenarios
20 Jul 2005
288-v1 CMS HCAL Scenario: LHC@FNAL participation in the CMS commissioning activities Patty McBride Scenarios
20 Jul 2005
213-v6 Scenario - First beam in the LHC Elvin Harms Scenarios
20 Jul 2005
178-v2 Scenario: LHC beta beating analysis Mike Lamont Scenarios
20 Jul 2005
128-v8 Scenario: LHC Beam Study Elliott McCrory Scenarios
20 Jul 2005
126-v10 Magnet Quench Scenario Michael Lamm Scenarios
20 Jul 2005
206-v1 Meeting minutes June 16, 2005 Erik E Gottschalk et al. Minutes
29 Jun 2005
189-v1 Meeting minutes June 9, 2005 Suzanne Panacek Minutes
13 Jun 2005
164-v1 Meeting minutes June 2, 2005 Erik E Gottschalk et al. Minutes
06 Jun 2005
121-v1 Meeting Minutes May 26, 2005 Erik E Gottschalk et al. Minutes
01 Jun 2005
105-v1 Meeting Minutes May 19, 2005 Erik E Gottschalk et al. Minutes
24 May 2005
115-v2 Remote Operations - CMS Patty McBride CMS detector
19 May 2005
94-v2 Meeting Minutes May 12, 2005 Erik E Gottschalk et al. Minutes
19 May 2005

Number of documents found: 132

Execution time: 46 wallclock secs (13.09 usr + 2.10 sys = 15.19 CPU)