LHC@FNAL Requirements Review

Simple document list
(16 extra documents)

Full Title: LHC@FNAL Requirements Review
Date & Time: 21 Jul 2005 at 07:30
Event Location: Black Hole (WH-2NW)
External URL: LHC@FNAL Requirements Review
Event Info: A review of the preliminary LHC@FNAL Requirements Document.
Start Title Author(s) Topic(s) File(s) Length
07:30 Executive Session Erik E Gottschalk Requirements
PDF
PPT
00:30
08:00 Introduction to LHC@FNAL Erik E Gottschalk Requirements
PDF
PPT
00:10
08:10 LHC@FNAL: Requirements for CMS Patty McBride Requirements
PDF
PPT
00:40
08:50 LHC Accelerator Requirements Elvin Harms Requirements
PDF
PPT
00:40
09:30 Executive Session None
None
None
01:00

Other documents for this event

CMS-doc-# Title Author(s) Topic(s) Last Updated
165-v46 LHC@FNAL Requirements Document Erik E Gottschalk et al. Requirements
24 Mar 2006
368-v1 Report from the July 21, 2005 Review Non-CMS Author et al. Requirements
23 Aug 2005
120-v9 Scenario - Tool development at FNAL for LHC Suzanne Panacek Scenarios
20 Jul 2005
138-v8 Scenario for debugging the Schottky detector Jean Slaughter Scenarios
20 Jul 2005
292-v1 CMS Computing Scenario: Patty McBride Scenarios
20 Jul 2005
286-v2 CMS Tracker Scenario: Tracker check out during operations Patty McBride Scenarios
20 Jul 2005
280-v2 CMS Tracker Scenario: Unstable Beam Conditions Patty McBride Scenarios
20 Jul 2005
287-v1 CMS Tracker Scenario: Tracker commissioning and debugging shifts Patty McBride Scenarios
20 Jul 2005
289-v2 CMS HCAL Scenario: detector expert participation in the CMS commissioning shifts Patty McBride Scenarios
20 Jul 2005
130-v5 Scenario - Run a "normal" CMS data-monitoring shift at FNAL Erik E Gottschalk et al. Scenarios
20 Jul 2005
290-v2 CMS HCAL Scenario: LHC@FNAL expert on-call during normal operations Patty McBride Scenarios
20 Jul 2005
288-v1 CMS HCAL Scenario: LHC@FNAL participation in the CMS commissioning activities Patty McBride Scenarios
20 Jul 2005
213-v6 Scenario - First beam in the LHC Elvin Harms Scenarios
20 Jul 2005
178-v2 Scenario: LHC beta beating analysis Mike Lamont Scenarios
20 Jul 2005
128-v8 Scenario: LHC Beam Study Elliott McCrory Scenarios
20 Jul 2005
126-v10 Magnet Quench Scenario Michael Lamm Scenarios
20 Jul 2005

Execution time: 0 wallclock secs ( 0.19 usr + 0.04 sys = 0.23 CPU)